Having worked the log flume that first year it was tricky. But when it worked correctly it was fantastic! How ever we would get power drains on the system. and the pumps would slow down or shut off. And all the stop dams on chut and spill way would come up backing up all the logs behind both. and lift one. Taking an hour to evca. and another to get it back up and running. Lots of fun!